Fluidseal Engineering
Loading…

Engineering overview

Inspections, failure analysis, drawings, machining lines and the machining projects in one place.

Machining lines

Dynamics machining lines, created this year. Machine mix: last 90 days. Columns: lines per week, last 12 weeks. Finished = 5 - Ready For Checking or later (board item 604).

Drawings — Content Management

Open drawings

Dynamics Content Management, content type Drawing, created since 2025-01-01. Done = 4 - Requires Checking or later (board item 603).

Projects

Dynamics projects, active, owned by Tony, Mark or Trevor or in the Machining department. Projects stay in Dynamics; they feed the performance review.

Open product quality and failure cases

Dynamics cases typed Product Quality or Product Failure, open. Start a failure report from the case the seal failed on.

Receiving inspections

Failure reports

Fluidseal Engineering · · Decisions: Dynamics Quotes Open Items 597 to 607 · Plan · Sources: Dynamics 365 (machining lines, Content Management drawings, projects, cases, returned goods, inventory notes), Supabase (products, profiles), www.sealsonline.com profile photos, Parker ORD 5700 and EPS 5370 failure modes, ISO 3601-3, ANSI/ASQ Z1.4.